Campus Facility Services Records, 1969-2008, Preliminary Inventory


Campus Facility Services Records, 1969- 2008
Preliminary Inventory
UA- 066
Qty.:  17.8 c.f. (17 Cartons 2 Document Boxes)


ABSTRACT

In 1972 the Buildings Services Department reported to the Vice Chancellor/Dean for Administrative Affairs.  Later, the department came under the supervision of the Director of Physical Plant.  By 1992, the department was named Campus Facilities Services and reported to the Vice Chancellor for Administration.

Records include operation and maintenance manuals for buildings and building equipment for various campus buildings.

ACCESS

Personnel and student records and other personal information in these records are restricted.  All other material is open to the public without restriction.  Copyright laws of the United States (Title 17, United States Code) govern the making of photocopies or other reproductions of copyrighted material.

PREFERRED CITATION

Cite as:  Campus Facility Services Records, Ruth Lilly Special Collections and Archives, University Library, Indiana University Purdue University Indianapolis.

ACQUISITION

Accessions:  A1997/98-013, A2006/07-028, A2010/11-008.

COLLECTION STATUS

This preliminary inventory serves as an interim guide to the described records.  A finished finding aid based on final appraisal and arrangement of the records of this university unit will be prepared at a future date.

Contents

Box

Nuclear Medicine Facility- Radiology, University Hospital Phase IIA- #763-782, 763-783, Electrical Section

1

 

Index, 5/26/1978

 

 

Panels, 10/31/1975

 

 

Dimming, 1969

 

 

Light Fixtures, 11/11/1976

 

 

Fire Alarm, 2/21/1978

 

 

Duct Detectors, undated

 

 

Nurse Call System, 2/10/1977

 

 

Clock System, 10/5/1976

 

IU Hospitals

 

 

Installation of Automatic Engine/ Generator Synchronizing & Paralleling Equipment, #852-1975, 3/25/1985

 

 

Central Medical Air System Revision, #854-2044, undated

 

Medical Research Building & Library, #855-2108, ca. 1985

 

Science & Engineering Technology Phase II, #855-2110

 

 

AHU-2-E [apparatus test report] 12/1991

 

 

AHU-2-W [air & water test & balance report] 10/1992

 

 

AHU-3-E [apparatus test report] 12/1991

 

 

AHU-3-W [apparatus test report] 12/1991

 

 

EE-1 to EE-10 [apparatus test report] 12/1991

 

 

Coil Data Sheets, undated

 

 

EF-1 to EF-2 [Diffuser & Grill Test] 12/1991

 

 

Electrical Maintenance- Intro, 1992-1994

 

 

Electrical Maintenance- Switchgear, 3/28/1990

 

 

Electrical Maintenance- Panel Boards, 125/1989

 

 

Electrical Maintenance - Busduct, 4/1990

 

 

Electrical Maintenance- Adjustable Frequency Controller

 

 

Electrical Maintenance- Computer Isolation Transformer

 

 

Electrical Maintenance- S & C Switch, 1989

 

 

Electrical Maintenance- Lighting Control, undated

 

 

Hoods, undated

 

 

Water Balance, 5/1992

 

 

Heating, 10/1992

 

 

General

 

 

Section 1- 21

 

 

Section A- G

 

 

General

 

Rotary Building- Opthalmology Clinic Renovation #856-2147

 

 

Index, 12/1988

 

 

Section 1- 4

 

 

Section 5- General

 

 

Section 5- Panel Board & Motor Control

 

 

Section 5- Conduit, Fittings & Cable

 

 

Section 5- Light Fixtures & Lamps

 

 

Section 5- Consolidated Lighting Inc.

 

 

Section 5- Bryant Devices & Floor Outlets

 

 

Submittal to Keith Electrical Intercom/ Paging System

 

Clinical Building # 859-2233, 3/24/1986

 

Coleman Hall #859-2235 Plumbing & Heating Section, ca. 1985

 

 

Index

 

 

Valve Chart

 

 

Unit Ventilator

 

 

Sheet Metal

 

 

Temperature Control

 

 

Plumbing & Medical Equipment

 

Institute for Psychiatric Research, HVAC Alterations- IU Hospital #865-2443, ca. 1986

 

 

Forward

 

 

Index

 

 

Balance Report, 9/24/1987

 

 

FEBCO Backflow Preventer

 

 

TACO Circulation Pumps, 1986

 

 

TACO Circuit Setters, 5/1/1981

 

 

Grinnell Valves

2

 

Armstrong Pipe Insulation, 9/3/1986

 

 

International Fan Coil Units, 7/22/1986

 

 

Johnson Controls- Temperature Controls, 10/21/1986

 

Medical Records Relocation #877-2731, ca. 1987

 

 

Contractors/ Suppliers

 

 

CDI (Construction Dynamics, Inc.) Field Reports, 1988-1989

 

 

Architect/ Owner Correspondence, 1988-1989

 

 

Thermal & Moisture Protection, 7/1988

 

 

Doors & Windows, 7/18/1988

 

 

Finishes, 8/1988

 

 

Specialties, 1988

 

 

Mechanical, 8/1988

 

 

Electrical, 8/1988

 

 

Wood & Plastics, 8/1988

 

 

[Record Manual] 2/24/1988, 1-3, A-C

 

Radiologic/ Physics Renovation # 879-2823, ca. 1987

 

 

Index

 

 

Unistrut Indianapolis, 6/25/1990

 

 

Gate Company- Kelmar Traffic Decks

 

 

Firestone Building Products, 1990

 

 

Mid-America Building Products & EMCO, 1990

 

 

Window Replacement, 1990

 

 

Contract Hardware & Specialties, 1990

 

 

Glazed Tile Walls

 

 

Gates Company- EMBE Composition floors

 

 

Commercial Flooring

 

 

B & E Painting, 1990

 

 

Chalkboards & Tackboards

 

 

Accurate Partitions- Toilet Partitions

 

 

Tate Access Floors

 

 

Medart Lockers

 

 

Washroom Accessories

 

 

Draper Shade & Screen- Protection Screens

 

 

Darkroom Door

 

 

Horizontal Aluminum Blinds

 

 

Project Manual

 

Psychiatric Research Animal Quarters Upgrade #881-2914, ca. 1988

 

 

General, 4/18/1989

 

 

Plumbing- Section 1

 

 

Insulation- Section 2

 

 

HVAC- Section 3

 

 

Fan Coil Units- Section 4

 

 

Tempmaster VAV Boxes- Section 5

 

 

Anemostat- Section 6

 

 

Ventilation - Section 7

 

 

Roof Exhauster- Section 8

 

 

Prefabricated Curbs- Section 9

 

 

Humidifier- Section 10

 

 

Duct Accessories- Section 11D-E

 

 

Valves- Section 12

 

 

Titus Constant Volume Boxes- Section 13

 

 

Johnson Controls- Section 14

 

School of Dentistry Remodel #882-2945, ca. 1988

 

 

Index

 

 

Section A- H

 

 

Section I

3

 

Warranties

 

Medical Science- Biochemistry Lab/Office Remodeling, #886-3058, ca. 1988

 

 

General- Mechanical, Book 1

 

 

Section A- I, Book 1

 

 

Warranties & Valve Chart, Book 1

 

 

General-Mechanical, Book 1a

 

 

Section A-B, Book 1a

 

 

Precision Control Maintenance, Book 1a

 

 

Section C- I, Book 1a

 

 

Warranties & Valve Chart, Book 1a

 

 

Index, Book 2

 

 

Asbestos Removal, Book 2

 

 

Finish Selection, Book 2

 

 

Selective Demolition, Book 2

 

 

Masonry, Book 2

 

 

Metal Fabrication, Book 2

 

 

Rough Carpentry, Book 2

 

 

Architectural Woodwork, Book 2

 

 

Insulation, Book 2

 

 

Joint Sealers, Book 2

 

 

Steel Frames, Book 2

 

 

Flush Wood Doors, Book 2

 

 

Folding Doors & Partitions, Book 2

 

 

Finish Hardware, Book 2

 

 

Glass & Glazing, Book 2

 

 

Gypsum Drywall, Book 2

 

 

Acoustical Ceiling, Book 2

 

 

Terrazzo, Book 2

 

 

Resilient Flooring, Book 2

 

 

Carpeting, Book 2

 

 

Special Coating, Book 2

 

 

Painting, Book 2

 

 

Marker Boards & Tack Boards, Book 2

 

 

Signage, Book 2

 

 

Fire Extinguishers & Accessories, Book 2

 

 

Accessories, Book 2

 

 

Laboratory Fume Hood, Book 2

 

 

Window Treatment, Book 2

 

 

Mechanical, Book 2

 

 

Electrical, Book 2

 

 

Index, Book 2a

 

 

Asbestos Removal, Book 2a

 

 

Finish Schedule, Book 2a

 

 

Selective Demolition, Book 2a

 

 

Unit Masonry, Book 2a

 

 

Metal Fabrications, Book 2a

 

 

Rough Carpentry, Book 2a

 

 

Architectural Woodwork, Book 2a

 

 

Insulation, Book 2a

 

 

Joint Sealers, book 2a

 

 

Steel Frames, Book 2a

 

 

Flush Wood Doors, Book 2a

 

 

Folding Doors & Partitions, Book 2a

 

 

Finish Hardware, Book 2a

 

 

Glass & Glazing, Book 2a

 

 

Gypsum Drywall, Book 2a

 

 

Acoustical Ceiling, Book 2a

 

 

Terrazzo, book 2a

 

 

Resilient Flooring, Book 2a

 

 

Carpeting, Book 2a

 

 

Special Coating, Book 2a

 

 

Painting, Book 2a

 

 

Marker Boards & Tack Boards, Book 2a

 

 

Signage, Book 2a

 

 

Fire Extinguisher & Accessories, Book 2a

 

 

Accessories, Book 2a

 

 

Laboratory Fume Hoods, Book 2a

 

 

Window Treatment, Book 2a

 

 

Fire Protection Piping, Book 2a

 

 

Mechanical, book 2a

 

 

Electrical, book 2a

 

Medical Science- Chilled Water Service, #888-3113, ca. 1988

 

 

Index

 

 

Map

 

 

Temperature Control

 

Lecture Hall- Electronic Classroom Renovation, #891-3256, ca. 1989

 

 

Index

 

 

Material Supplier & Subcontractor List

 

 

Certificate of Substantial Completion

 

 

Warranties

 

 

Metal Fabrication

 

 

Finish Carpentry/ Millwork

 

 

Doors & Hardware

 

 

Acoustic Wall System

 

 

Floor Covering

 

 

Painting

 

 

Miscellaneous Specialties

 

 

Equipment/ Furnishings

 

Medical Science- Pathology Research Center Renovation, #893-3293

 

 

Index, 1991

 

 

Miscellaneous

 

 

Architectural, 1990-1991

 

 

Processing Equipment, 1989

 

 

Equipment, 1991

 

 

Mechanical, 1991

 

 

Electrical

 

 

Drawings

 

Medical Science- Anatomy Lab/ Office Remodel, #898-3415

 

 

Index

 

 

Valves- Section A

 

 

Ventilation - Section B

 

 

Mechanical Insulation- Section C

 

 

Pipes & Tubes- Section D

 

 

Drains- Section E

 

 

Plumbing- Section F

 

 

Water Cooler, Eye Wash Unit, Emergency Shower- Section G

 

 

Steam/ Piping- Section H

 

 

Humidifiers- Section I

 

 

Industrial Thermometers- Section J

 

 

Fans, Ducts, Grills- Section K

 

 

Johnson Controls, Inc.- Section L

 

 

“Isomix” Constant Volume Coil- Section M

 

 

Pumps- Section N

 

 

Air & Hydronic Distribution Systems- Section O

 

 

Warranties

 

 

Valve Chart & Map

 

 

Index, Book 2

 

 

Fire Protection Sprinkler System

 

 

Section A- L, Book 2

 

 

Section N- O, Book 2

4

 

Warranties, Book 2

 

 

Valve Chart & Map, Book 2

 

 

Electrical- Raceways

 

 

Electrical- Light Fixtures

 

 

Electrical- Devices/ Plates

 

 

Electrical- Motor Starters

 

 

Electrical- Disconnects

 

 

Electrical- Transformers

 

 

Electrical- Capacitors

 

 

Electrical- Panel Boards

 

 

Electrical- Testing

 

Medical Science- Pathology Research Center, #898-3438, ca. 1989

 

 

Condensing

 

 

Control/ Display Board

 

 

Controls

 

 

Drains

 

 

Fixtures

 

 

Humidifier

 

 

Equipment

 

 

Leakage Test

 

 

Sheet Metal

 

 

TACO Pumps

 

 

Test, Adjust & Balance Report

 

 

Valves

 

Clinical Building- Medical Genetics Lab, #898-3441, ca. 1989

 

 

General & Index

 

 

Sub Contractor/ Supplier

 

 

AMSCO Medical Equipment

 

 

ARCO Glass

 

 

A & S Industries Vertical Blinds

 

 

Berline Construction- Metal Framework, Drywall, Ceilings

 

 

Cardinal Fence

 

 

Certified Flooring

 

 

Contract HDW- Finish Hardware

 

 

Creative Enterprises- Caulking/ Sealant

 

 

Kloeppel, Harry J.- Fume Hoods & Furniture

 

 

Mid-America Building Products- Darkroom Doors

 

 

Schricker Co.- Metal Partitions & Accessories

 

 

H. Sims Painting

 

 

Wilson Partenheimer- Folding Walls

 

Long Hospital/ Clinical Building Office Refurbishment, #898-3758, ca. 1989

 

 

Index

 

 

Sublist

 

Science & Engineering Tech. Phase III, #903-3602, ca. 1990

 

 

Clock System

 

 

Intercom System

 

 

Card Access System

 

 

Dry Type Transformers

 

 

BRK Time Switches

 

 

Hi Volt Switch & Transformer

 

 

Switchboards

 

 

Lighting

 

 

Lighting Fixtures

 

 

Lutron Systems

 

 

Lutron Wall Box

 

 

Emergency Lighting

 

 

Relay Panel

 

 

Wiring Devices

 

 

Cable Tray

 

 

Bus Duct Riser

 

 

Isoduct

 

 

Lighting Contractors

 

 

Panel Boards

 

 

Centrifugal Fans

 

 

SP Exhaust Fans

 

 

Centrifugal Inline

 

 

VAV- Fan Powered

 

 

VAV Cooling

 

 

Adjustable Pitch Standard Fan

 

 

Adjustable Pitch Compax Fan

 

 

Introduction (Contents)

 

 

Motor Controllers & Safe Switches

 

 

Fire Alarm System

 

Medical Research & Library- Medical Genetics Office, #903-3608, ca. 1990

 

 

Index

 

 

Building Insulation

 

 

Sealants

 

 

Access Doors & Panels

 

 

Gypsum Drywall

 

 

Quarry Tile & Brick Pavers

 

 

Acoustical Ceiling

 

 

Painting & Finishing

 

 

Louver Blinds

 

 

Division 15- Mechanical

 

 

Sprinkler System

 

 

Division 16- Electrical

 

Business/ SPEA- 4th Floor Remodel & Renovation, #904-3609, ca. 1990

 

 

Index

 

 

Architectural Woodwork

 

 

Flush Wood Doors

 

 

All Glass Entrances

 

 

Gypsum Drywall

 

 

Acoustical Ceiling

 

 

Resilient Flooring/ Carpeting

 

 

Painting/ Wall Coverings

 

 

Mechanical

 

 

Electrical

 

Lab Animal Resource Center, #907-3712, ca. 1990

 

 

Index & Valve Tag Chart

 

 

Valve Tag Chart

 

 

Expansion Joint

 

 

Valves/ Fittings

 

 

Insulation

 

 

Inertia Frames

 

 

Animal Drinking

 

 

Floor Drain

 

 

Faucet/ Hose Reel

 

 

Pumps

 

 

Traps

 

 

Condensate

 

 

Pressure Gauge

 

 

Coil

 

 

Humidifier

 

 

Air Handling

 

 

Grills/ De-fuser

 

 

Filters

 

 

Balance Reports

 

Long Hospital/ Clinical Building Office Refurbishment, #909-3758, ca. 1990

 

 

Contractor’s Guarantee

 

 

Mechanical

 

 

Electrical

 

School of Dentistry- Cell Culture Lab Renovation, #909-3768, ca. 1990

 

 

Index

 

 

Temperature Control- Section 1

 

 

Pipe Insulation- Section 2

 

 

Air Distribution- Section 3

 

 

Plumbing Fixtures- Section 4

 

 

Air Distribution Tests- Section 5

 

 

Mechanical Work- Section 6

 

Psychiatric Research- Molecular Neurobiology Lab, #909-3771, ca. 1990

 

 

General

 

 

Index

5

 

Valve Tag Chart

 

 

Valves

 

 

Sleeve Seal

 

 

Backflow Preventer

 

 

Vacuum Pump

 

 

Fittings

 

 

Water Main

 

 

PRV & Traps

 

 

Hydronics

 

 

Air Handling Unit

 

 

Duct Coating

 

 

Air Distribution

 

 

Temperature Control

 

 

Balance Testing

 

 

Thermometer Gauges

 

Lab Animal Facility Renovation- Riley Research, #912-3709, ca. 1991

 

 

General

 

 

Mechanical

 

 

Adjusting & Balancing

 

 

Labeling & Identification

 

 

Josam Company- Restroom Equipment

 

 

Water Heaters

 

 

Water Softener

 

 

Restroom Fixtures

 

 

Hydronic Piping System

 

 

Hydronic Pumps

 

 

Thermometers

 

 

Gauges

 

 

Shell & Tube Converter

 

 

Hot Water Booster Coil

 

 

Air Distribution

 

 

Humidifiers

 

 

Air Handling Unit

 

 

Centrifugal Fan

 

 

Utility Set Exhaust Fans

 

 

Low Pressure Ductwork

 

 

Special Ductwork

 

 

Ductwork Accessories

 

 

Registers, Grills, Diffusers

 

 

Air Filters

 

 

Johnson Controls- Environmental Control System

 

 

Balance Report

 

 

Adjusting/ Balancing

 

Pathology/ Development Offices Renovation, #922-4138, ca. 1992

 

 

Index

 

 

Vendors

 

 

Manuals

 

 

Heads

 

 

Valves

 

 

Electrical Switches

 

 

NFPA, 13A

 

 

Warranties

 

 

Map

 

Cancer Research Center, #923-4169, ca. 1992

 

 

Laboratory Finishings

 

 

Project Manual 1

 

 

Project Manual 2

 

 

Index- Book 1

 

 

Contractor/ Supplier List

 

 

Glenroy Construction Co., Inc. Guarantee

 

 

Kitchen Materials/ Equipment

 

 

Terrazzo

 

 

Glass & Glazing & Aluminum Curtain Wall

 

 

Elastic Sheet Roofing

 

 

Ceramic Tile

 

 

Marker Boards, Tack Boards & Display Cases

 

 

Metal Roof & Sheeting

 

 

Darkroom Doors

 

 

Epoxy Flooring

 

 

Plaster, Drywall & Panels

 

 

Material Processing Equipment

 

 

Lawn Irrigation

 

 

Waterproofing/ Sealants

 

 

Siding

 

 

Processing Equipment & Fume Hoods

 

 

Resilient Flooring & Carpeting

 

 

Sewer Collection System

 

 

Louvers

 

 

Material Processing Equipment

 

 

Overhead Coiling Doors

 

 

Elevators

 

 

Material Processing Equipment

 

 

Scissors Lift & Dock Levelers

 

 

Toilet Partitions

 

 

Landscape

 

 

Lockers, Fire Extinguishers

 

 

Epoxy Coating, Operable Wall, Toilet & Bath Accessories

 

 

Corner Guards

 

 

Flush Wood Doors

 

 

Projection Screens

 

 

Index

 

 

Adjustable Frequency Drive

 

 

Valves

 

 

Mechanical Insulation

 

 

[Section 4, empty, on file in Fire Protection Services Office]

 

 

Centrifugal Pumps

 

 

Pumping Systems

6

 

Plumbing Equipment

 

 

Submersible Pumps

 

 

Sewer Pumps

 

 

Acid Neutralization Tanks

 

 

Pumps

 

 

Water Softener

 

 

Vacuum Systems & Compressors

 

 

R.O. Unit

 

 

Pump Controls

 

 

Re-pressurization Pumps

 

 

HPS

 

 

TLS 1 & 2

 

 

UV Light

 

 

Industrial Units- Water Treatment

 

 

Installation- Constant Conductivity/ Resistivity Sensors

 

 

Restroom Fixtures

 

 

Centrifugal Pumps

 

 

Badger Meter

 

 

Vented Condensate Units

 

 

Cooling Tank, Valves & Fittings, Temperature Regulators

 

 

Chemical Shot Feeder

 

 

Air Systems

 

 

Vulcan Fin Tube

 

 

Hydronic Cabinet Unit Heaters

 

 

Chilled Water Coils

 

 

Air Handling Units

 

 

Ventilation

 

 

APEX Industries, Inc. (Correspondence re: materials)

 

 

Fire Dampers

 

 

Air Volume Boxes with Hot Water Coil

 

 

Grills & Registers

 

 

[Air Filters- empty]

 

 

HVAC System

 

 

Adjusting & Balancing

 

 

Laboratory Fume Hoods

 

 

Warranties

 

 

Carbon Dioxide

 

 

Chilled Water

 

 

De-ionized Water

 

 

Domestic Water

 

 

Heat Recovery

 

 

Heating Water

 

 

High Pressure Air Lab

 

 

Lab Air

 

 

Lab Vacuum

 

 

Low Pressure Steam/ Condensate

 

 

Medium Pressure Steam/ condensate

 

 

Natural Gas

 

 

Nitrogen

 

 

Perimeter Hot Water

 

Coleman Hall HVAC Remodel, #926-4231, ca. 1992

 

 

Sheet Metal

 

 

Unit Heater, HW Coils

 

 

Hot Water Specialties

 

 

Insulation

 

 

Temperature Controls

 

 

Balance

 

 

Valve Charts

 

 

Air Cooled Fluid Coolers

 

Business/ SPEA- Rooms 2001 & 2003, #933-4495, ca. 1993

 

 

Index

 

 

General

 

 

Vendors

 

 

Info & Maintenance

 

 

Warranties

 

Riley Research & Medical Science Remodel, #936-4543, ca. 1993

 

 

General

 

 

Vendors

 

 

Info & Maintenance

 

 

Warranties

 

Emerson Hall- Cardiothoracic Surgery Office Renovation, #949-4880, 1994

 

 

Fire Protection

 

 

Index- Part 1

 

 

Directories

 

 

Casework

 

 

Hollow Metal Doors & Hardware

 

 

Glass Glazing

 

 

Flooring

 

 

Painting & Vinyl Wall Covering

 

 

Fire Extinguishers & Cabinets

 

 

Signs

 

 

Plumbing/ HVAC

 

 

Electrical

 

 

Electric Fire Protection

 

 

Warranties

 

 

Index- Part 2

 

 

Air Handling Units

 

 

Plumbing Fixtures

 

 

Ventilation Test Reports

 

 

Sprinkler Fixtures

 

 

Sprinkler System

 

 

Controls

 

 

Fire Protection Sprinkler System

 

SET (Science & Engineering Tech.) III, #1022-0073, 1994

 

Clinical Building- Chilled Water Service, #1567, ca. 1990

 

 

General & Index

 

 

Badger Meter

 

 

Temperature Controls

 

 

Valve Tag Charts

 

School of Dentistry- Orthodontics, #4022-0105, 1995

 

University Hospital- Remodel & Alterations, #8311-1693, ca. 1983

 

Fesler Hall- Nephrology Research & Faculty Offices, #9210-4340, ca. 1992

 

 

General

 

 

Pipe

 

 

Sprinklers

 

 

Fittings

 

 

Hangers

 

 

NFPA 13A

 

 

Warranties & Maintenance

 

 

Index

 

 

Electrical Switches, Dimmers & Outlets

 

 

Electrical Safety Switches & Fuses

 

 

Electric Panel Boards

 

 

Magnetic Starters

 

 

Light Fixtures

 

 

Fire Protection Equipment

 

 

Electric Wiring

 

IU Hospital- Clinical Cancer Center, #9212-4394, ca. 1992

7

Medical Science- Auditorium Renovation, #9511-5209, ca. 1995

 

 

Index

 

 

Project Phone Directory

 

 

Warranty

 

 

Hollow Metal Frames & Wood Doors

 

 

Acoustical Ceiling Systems

 

 

Resilient Tile Flooring & Carpeting

 

 

Painting & Wall covering

 

 

Pipe & Duct Insulation

 

 

Fan Coil Unit

 

 

Grilles, Registers, Diffusers, etc.

 

 

Temperature Controls

 

 

Test & Balance Report

 

 

Sound System Description

 

 

Sound System Equipment Information

 

 

Index

 

 

Devices

 

 

Panels

 

 

Fixtures

 

 

Dimming

 

Old Library- Installation Manual, #CTS-89238-39

 

 

General

 

 

Mechanical

 

 

Electrical

 

 

Fixtures

 

 

Schematics

 

Old Library Renovation- Undergraduate Education Center, #WCC1-96-53

 

 

Index

 

 

Project Phone Directory

 

 

Wurster Construction Co., Inc. Limited Warranty

 

 

Glass Handrail

 

 

Custom Casework

 

 

Roofing System

 

 

Doors/ Frames & Hardware

 

 

Overhead Coiling Doors

 

 

Power Door Operations

 

 

Ceramic Tile

 

 

Acoustical Ceiling/ wall Systems

 

 

Flooring Systems

 

 

Painting

 

 

Visual Display Boards

 

 

Corner Guards

 

 

Metal Lockers

 

 

Toilet Accessories

 

 

Projection Screens

 

 

Entry Mats

 

 

Electronic Traction Elevators

 

Riley Children’s Hospital #4, #C38332

 

Riley Hospital Molecular Neurobiology Lab, 1992

 

Rotary Building- Lab Renovation, ca. 1990

 

 

General

 

 

Electrical Panel Boards & Switches

 

 

Light Fixtures

 

 

Electrical Lamps (Bulbs)

 

 

Switches & Outlets

 

 

Raceway Systems

 

Gross Anatomy Lab Renovation, ca. 1996

 

 

Warranty

 

 

Pumps

 

 

Sheet Metal

 

 

Plumbing Fixtures

 

 

Insulation

 

 

Hydronic Specialties

 

 

HVAC Equipment

 

 

Temperature Control

 

 

Water Treatment

 

 

Acid Waste

 

 

Water Purification

 

 

Balancing

 

 

Valve Tags

 

Medical Research, #CT-SPM-58734-5

 

 

Index

 

 

Mechanical

 

 

Electrical

 

 

Fixtures

 

 

Drawings & Schematics

 

Lecture Hall- Electronic Classroom Renovations, ca. 1990

 

 

Index

 

 

Vendors List

 

 

Valve Tag Chart

 

 

Test, Adjust & Balance Report

 

 

Air Handling

 

 

Pumps

 

 

Humidifiers

 

 

Insulation

 

 

Sheet Metal Accessories

 

 

Pipe, Valves & Fittings

 

 

Chemical Treatment

 

Old Library Building- Installation Manual CTS-89238-39, Index

8

Business/SPEA Manuals- Mechanical, ca. 1995

 

Dover Elevator Owner’s Guide- Unknown Building, #EC2868

 

School of Dentistry Manuals- No Number

 

 

Index

 

 

Supply Fans

 

 

Return Fan

 

 

Diffuser & Grille Test Reports

 

 

Exhaust Fans

 

 

Exhaust Grille Test Reports

 

 

Pumps

 

 

Reheat Coils

 

 

Cooling Coils

 

 

Cooling Tower

 

Clinical Building

 

 

Index

 

 

Piping Specialties

 

 

Domestic Water Distribution Piping

 

 

Compressed Air Systems

 

 

Index- Lab Vacuum

 

 

Vacuum Insulated Piping System

 

 

Bayonet Assembly

 

 

Field Pressure/ Leak Check Procedure

 

 

Vacuum Insulated LN2 Piping

 

 

Cryogenic Glove Valves

 

 

Vacuum Seal off Valves & Operators

 

 

Natural Gas Systems

 

 

Air Handling Units

 

 

Test, Adjust & Balance Reports

 

 

Temperature Control Systems

 

 

Polypropylene Piping

 

Visitor’s Parking Ramp- IU Medical Center, #87094.30

 

Adult Ambulatory Care Center, # 87094.00

 

Long Hospital- Outpatient Clinic, ca. 1973

 

Cancer Research Center, #AD44, ca. 1997

 

 

Fire Protection

 

 

Sound System

 

 

Fire Alarm Control Panels

 

 

Table of Contents & Adjustable Frequency Drive

 

 

Valves

 

 

Mechanical Insulation

 

 

Fire Protection Manual Index

 

 

Zone Chart- Fire Protection

 

 

Sprinklers

 

 

Valves

 

 

Electrical Switches

 

 

Miscellaneous

 

 

Fire Pump

 

 

NFPA 13A

 

 

Maintenance Schedule

 

 

Pumps

 

 

Pumping System

 

 

Fire/ Pumping Accessories

 

 

Submersible Pumps

 

 

Sewage Ejectors

 

 

Acid Neutralization Tanks

 

 

Water Heater

 

 

Water Softeners

 

 

Vacuum Systems & Compressors

 

 

R.O Unit

 

 

Pump Controls

 

 

Re-pressurization Pumps

 

 

HPS

 

 

TLS 1 & 2, Industrial Pressure Switches

 

 

UV Light

 

 

Resistivity Mon.

 

 

Conductivity/ Resistivity Sensors

 

 

Plumbing Fixture & Trim

 

 

Hydronic Pumps

 

 

Badger Meter

 

 

Vented Condensate Units

 

 

Cooling Tank, Valves & Fittings, Thermometer

 

 

Water Treatment

 

 

Valves

 

 

Vulcan Fin Tube

 

 

Hydronic Cabinet Unit Heaters

 

 

Chilled Water Coils

 

 

Air Handling Units

 

 

Fan/ Ventilation

 

 

APEX Industries (Correspondence)

 

 

Fire Damper

 

 

Air Volume Boxes with Hot Water Coil

 

 

Grilles & Registers

 

 

APEX Industries- Filters

 

 

HVAC Systems

 

 

Adjusting & Balancing Report

9

 

Laboratory Fume Hoods

 

 

Warranties

 

 

Valve Tag Lists [to be provided upon completion]

 

Cancer Research Center- Additions & Renovations, #AD44

 

 

General

 

 

Cable

 

 

L.V. Busway

 

 

Cable Tray

 

 

Cable Insulation

 

 

Safety Switches & Circuit Breakers

 

 

Caterpillar Generator Set

 

 

Short Circuit & Overcurrent Protective Device Coordination Study- Table of Contents

 

 

Short Circuit… Introduction

 

 

Short Circuit… Summary

 

 

Short Circuit… Calculations

 

 

Short Circuit… Coordination

 

 

Circuit Breakers

 

 

Switchgear

 

 

Load Interrupter

 

 

Switchgear Test

 

 

Low Voltage Switchgear

 

 

Electric Transformers/ Panel Boards

 

 

Distribution Panel Boards

 

 

Normal Low- Electric Circuits

 

 

Normal High- Electric Circuits

 

 

Emergency Low- Electric Circuits

 

 

Emergency High- Electric Circuits

 

 

Lab Basement- 4th Floors- Electric Circuits

 

 

Low Volt MCC (Motor Control Centers)

 

 

Light Fixtures

 

 

Light Bulbs

 

 

Lightning Protection

 

 

Sound System

 

 

Cable

 

 

Door Security/ Card Access System

 

 

Lutron Dimming System

 

Medical Information Sciences Building – O + M Manuals               8/2005

 

 

Contractor Subcontractor and Material Supplier List

 

 

Statement of Warranty

 

 

Testing & Proof of Performance

 

 

Valves

 

 

Piping Specialties

 

 

Expansion Compensation

 

 

Meters and Gauges

 

 

Supports and Anchors

 

 

Mechanical Identification

 

 

Vibration Control

 

 

Mechanical Insulation

 

 

Fire Protection Sprinkler System

 

 

Fire Pumps

 

 

Standpipe and Hose Systems

 

 

Domestic Water Distribution Piping

 

 

Drainage and Vent Systems

 

 

Interceptors

 

 

Fixtures

 

 

Sewage and Sump Pumps

 

 

Domestic Water Pumps

 

 

Water Softeners

 

 

Instantaneous Steam Water Heater

 

 

Natural Gas Systems

 

 

Hydronic Piping

 

 

Hydronic Specialties

 

 

Steam and Condensate Piping

 

 

Med/High Pressure Steam Supply and Condensate Return

 

 

Variable Volume Terminal Units

 

 

HVAC Pumps

 

 

Chemical Treatment Systems

 

 

Split System Outdoor Heat Pump Units

 

 

Indoor Heat Pump System

 

 

Heat Exchanger – Shell and Tube

 

 

Intergral Face and Bypass Coil

 

 

Humidifiers

 

 

Terminal Units

 

 

Air Handling Units

 

 

Variable Air Volume – Custom Air Handling Unit

 

 

Centrifugal Fan

 

 

Exhaust Fans

 

 

Low Pressure Ductwork

 

 

High Pressure Ductwork

 

 

Flexible Ductwork

 

 

Buried Ductwork

 

 

Prefabricated Insulated Plenum Panels

 

 

Ductwork Accessories

 

 

Sound Attenuators

 

 

Variable Volume Terminal Units

 

 

Diffusers, Registers and Grilles

 

 

Roof Vents

 

 

Adjusting and Balancing

 

 Medical Information Sciences Building – Duct Testing                2/14/2006

10

 

Basement North

 

 

1st Floor North

 

 

1st Floor South

 

 

2nd Floor North

 

 

2nd Floor South

 

 

3rd Floor North

 

 

3rd Floor South

 

 

4th Floor

 

 

5th Floor

 

Medical Information Sciences Building – O + M Telecommunication11/2007

 

 

Conduit

 

 

Insulation

 

 

Warranty

 

Medical Information Sciences Building – O+M Electrical Volume 1   7/2007

 

 

Basic Electrical Materials and Methods

 

 

Overcurrent Protective Device Coordination

 

 

Grounding and Bonding

 

 

Electrical Identification

 

 

Testing (includes CD)

 

 

Conductors and Cables

 

 

Medium-Voltage Cables

 

 

Raceways and Boxes

 

 

Cable Trays

 

 

Wiring Devices

 

 

Lighting Control Devices

 

 

Enclosed Switches and Circuit Breakers

 

 

Fuses

 

Medical Information Sciences Building – O+M Electrical Volume 2  11/2005

 

 

Packaged Engine Generators (includes CD)

 

 

Transfer Switches

 

Medical Information Sciences Building – O+M Electrical Volume 3  5/2005

 

 

Medium Voltage Switch – MVS – MSA

 

 

Power Transformers – UTR – OTX

 

 

Low Voltage Switchgear – LVA

 

 

Switchboards – SUS

 

 

Busway – BUS

 

 

Motor Control Centers – FVC

 

 

Panelboards – SUP

 

 

Dry Type Transformers – DTT

 

 

Shop Drawings

 

Medical Information Sciences Building – O+M Electrical Volume 4   1/2006

 

 

Interior Lighting

 

 

Exterior Lighting

 

 

Dimming Controls

 

Medical Information Sciences Building – O+M Electrical Volume 5 10/2005

 

 

Lighting Protection

 

 

Fire Detection and Alarm System – Addressable

 

 

Public Address and Music Equipment

 

 

Voice and Data Communication Cabling (includes CD)

 

Medical Information Sciences Building – O+M         9/1/2005

 

 

Termite Control

 

 

Water Distribution

 

 

Sanitary Sewerage

 

 

Storm Drainage

 

 

Stone Paving – Bluestone

 

 

Irrigation Systems

 

 

Lawns & Grasses

 

 

Exterior Plans

 

 

Thermoplastic Sheet Waterproofing

 

 

Vertical Metal Wall Panel Cladding

 

 

Insulated Metal Wall & Soffit Panels

 

 

EPDM Membrane Roofing – Ballasted

 

 

Roof Expansion Assemblies

 

 

Sprayed Fire – Resistive Materials

 

 

Joint Sealers

 

 

Flush Wood Doors

 

 

Overhead Coiling Doors

 

 

Aluminum-Framed Entrances & Stormfronts

 

 

Metal-Framed Skylights

 

 

Door Hardware – Scheduled

 

 

Automatic Door Operators

 

 

Glazing

 

 

Self-Opaqueing Glass

 

 

Decorative Plastic Glazing

 

 

Glazed Curtain Wall

 

 

Ceramic Tile

 

 

Dimension Stone Tile

 

 

Acoustical Panel Ceilings

 

 

Metal Specialty Ceilings

 

 

Resilient Floor Tile

 

 

Resinous Flooring Mezzanine Waterproofing

 

 

Carpet

 

 

Carpet Tile

11

 

Interior Stone Facing

 

 

Acoustical Wall Panels

 

 

Sound Control Wall & Ceiling Panels

 

 

Painting

 

 

High Performance Coatings Aliphatic Polyurethane

 

 

Visual Display Surfaces

 

 

Directory Display Cases

 

 

Impact-Resistant Wall Protection

 

 

Corner Guards – Stainless Steel

 

 

Access Flooring

 

 

Flagpoles

 

 

Building Signs

 

 

Metal Lockers

 

 

Solid Phenolic Lockers

 

 

Postal Specialties

 

 

Toilet and Bath Accessories

 

 

Window Cleaning Equipment

 

 

Projection Screens

 

 

Loading Dock Equipment

 

 

Kitchen Equipment Appliances

 

 

Roller Shades

 

 

Floor Slab Jack-up System

 

 

Glazed Entry Canopy Structures

 

 

Electric Traction Elevators Passenger and Service

 

 

Electric Trolley Hoists

 

Medical Information Sciences Building – Painting 2/22/2007

 

Medical Information Sciences Building – Thyssenkrupp Elevator Owner’s Manual 3/16/2006

 

Medical Information Sciences Building – Rainbird Irrigation – Warranties 2/27/2007

 

Medical Information Sciences Building – Contract Hardware & Specialties 5/23/2007

 

 

IUPUI Med Info Sciences BLDG

 

 

IUPUI Med Info Sciences BLDG 1st Floor

 

 

IUPUI Med Info Sciences BLDG 2nd Floor

 

 

IUPUI Med Info Sciences BLDG 3rd Floor

 

 

IUPUI Med Info Sciences BLDG 4,5,6,7th Floor

 

Business/SPEA Renovation of BS2000 – O + M Manual 9/12/2006

 

 

Ornamental Metals

 

 

Door Hardware

 

 

Gypsum Wall Assemblies

 

 

Acoustical Ceilings

 

 

Flooring

 

 

Paint

 

 

Visual Display Surfaces Projection Screens

 

 

System Furniture

 

 

Mechanical

 

 

Electrical

 

Business/SPEA Renovation – O + M Manual 9/1/2006

 

 

Steam Coil

 

 

Pumping Trap

 

 

Float Steam Traps

 

 

Relief Valves

 

 

Steam Reducing Valve

 

 

Flash Tank/ Condensate Cooler

 

 

Steam Accessories

 

 

VAV Box FCV

 

 

VAV Boxes

 

 

Test & Balance

 

Engineering Technology Building – Existing Basement Renovation 11/17/2005

 

 

Directory

 

 

Finish Schedule

 

 

Division 3 Concrete

 

 

Division 4 Masonry

 

 

Division 5 Metal Fabrications

 

 

Division 7 Joint Sealants

 

 

Division 8 Doors Frames & Hardware Glazing

 

 

Division 9 Gypsum Wall Assemblies Acoustical Ceilings

 

 

Division 9 Flooring Paint

 

 

Division 10 Specialties

 

Engineering Technology Building – Existing Basement Renovation 8/4/2005

 

 

General

 

 

Cellular Floor Raceway

 

 

Panel Boards

 

 

Lighting

 

 

Fire Alarm

 

Engineering Technology Building – Existing Basement Renovation 4/19/2007

 

 

Valves

 

 

Piping Specialties

 

 

Supports and Anchors

 

 

Mechanical Identification

 

 

Mechanical Insulation

 

 

Wet Pipe Sprinkler System

 

 

Domestic Water Distribution Piping

 

 

Soil and Waste Systems

 

 

Plumbing Fixtures

 

 

Hydronic Piping

 

 

Water Treatment Systems

 

 

Electrode Steam Generating Humidifiers

 

 

Centrifugal Fans

 

 

Ductwork Accessories

 

 

Air Outlets and Inlets

 

 

Air Terminals

 

 

Temp Control Systems/ Sequence of Operation

 

Campus Center Operation & Maintenance Manual Vol. 1 of 3. Index-15060

12

 

Index

 

 

Vendor List

 

 

Service & Maintenance Schedule

 

 

15020 Comp. & Start Up

 

 

15021

 

 

15025

 

 

15030

 

 

15060

 

Campus Center Operation & Maintenance Manual  Vol. 1, File 2 15160-15230

 

 

15160

 

 

15165

 

 

15170

 

 

15180/15190

 

 

15230

 

Campus Center Operations & Maintenance Manual Vol. 1, File 3 15235-15253

 

 

15235

 

 

15253

 

Campus CenterOperations & Maintenance Manual Vol. 1 File 4, 15265-15420

 

 

15265

 

 

15285

 

 

15305

 

 

15306

 

 

15315

 

 

15405

 

 

15412

 

 

15420

 

Campus Center Operations & Maintenance Manual Vol. 2 of 3, File 1, Index-15510

 

 

Index

 

 

15421

 

 

15422

 

 

15424

 

 

15427

 

 

15510

 

Campus Center Operations & Maintenance Manual Vol. 2 of 3, File 2 15701-15703

 

 

15701

 

 

15702

 

 

15703

 

Campus Center Operations & Maintenance Manual Vol. 2, File 3. 15710

 

15710

 

Campus Center Operations & Maintenance Manual Vol. 2, File 4. 15735-15750

 

 

15735

 

 

15736

 

 

15740

 

 

15742

 

 

15750

 

Campus Center Operations & Maintenance Manual Vol. 3, File 1. Index-15846

 

 

Index

 

 

15760

 

 

15765

 

 

15780

 

 

15820/15830

 

 

15840-15846

 

Campus Center Operations & Maintenance Manual Vol. 3, File 2, 1580-15895

 

 

15850

 

 

15860/15861

 

 

15870

 

 

15876

 

 

15895

 

Operation & Maintenance Manual, Vol. 1, File 1. Table of Contents-Cabinets. IUSD Endodontics Room #306

 

 

Certificate of Warranty

 

 

Project Directory

 

 

Cabinets

 

Operation & Maintenance Manual, Vol. 1, File 2, Thermal Protection- Electrical, IUSD Endodontics Room 306

 

 

Thermal & Moisture Protection

 

 

Finishes

 

 

Specialties

 

 

Plumbing

 

 

Electrical

 

Operation & Maintenance Manual IUSM Riley Research Room 140. File 1, 1-5

 

Operation & Maintenance Manual IUSM Riley Research Room 140 File 2, 1-10 & 1-5

 

Operation & Maintenance Manual File 1, Index-Plumbing , Riley Research Third Floor Renovation

 

Operation & Maintenance Manual File 2, HVAC-10, Riley Research Third Floor Renovation

 

 

HVAC

 

 

10

 

Special Projects Warranties for IUPUI Tunnel Repairs Phase II

 

 

Index

 

 

Lawns

 

 

Deck Waterproofing Membrane

 

 

Expansion Joint Sealing Systems

 

 

Elastometric Joint Sealants

 

 

Cementitious Crystalline Waterproofing

 

 

Window

 

Operation & Maintenance File 1, General - 16470 PDU-3, Communication Technology Complex-ICTC 024 Supplemental Cooling

 

 

General

 

 

16200 Panelboard

 

 

16200 Disconnects

 

 

16200 Encl. Switch

 

 

1625 ATS

 

 

16280 RDC “H”

 

 

16470 PDU-3

 

Operation & Maintenance File 2, 16612 “C”- Flywheel UPS FBO

 

 

16612 UPS “C”

 

 

16613 Flywheel UPS “C”

 

 

Flywheel UPS FBO

 

Operation & Maintenance Manual, File 3, Schematic Communication Technology Complex - ICTC 024 Supplemental Cooling

 

Operation & Maintenance Manual Engineering Science & Technology Building Project #20063486 HVAC Updgrades for Wet Labs Phase I, Job #2717, Sept 2007

13

University Hospital Parking Garage Emergency Repairs to Northwest Stairwell Project 20063536 Product Submittals 3/26/2007

 

Electrical Operation & Maintenance Manual, Division 16, Cavanaugh Hall, n.d.

 

 

Fuses

 

 

Transformers

 

 

Engineering Reports

 

 

Warranty

 

Project 20051999 Engineering & Technology Building 3rd Floor Renovations

 

 

Warranty

 

 

Panel Directories

 

 

Devices & Plates

 

 

Light Fixtures

 

 

Lamps

 

 

Cable Supports

 

 

V/D Devices, Plates

 

 

Patch Panel/Cable Mgement

 

 

Test Reports

 

 

Electrical

 

Project 20052098 Operation & Maintenance Manual, Emerson Hall, 5th Floor Renovation File 1, A-I

 

Project 20052098 Operation & Maintenance Manual, Emerson Hall, 5th Floor Renovation File 2, J-S

 

Operation & Maintenance Manual Emerson Hall Lighting, 11/7/2007

 

Maintenance Manual Emerson Hall 5th Floor Renovation Project 20052098 Mechanical Work Completed 2007

 

 

Plumbing Fixtures

 

 

Sheet Metal

 

 

Sheet Metal I, O & M

 

 

Carrier Air Handling Unit

 

 

Carrier AHU I, O & M

 

Instruction Manual SEL-2030 Communications with CD 9/52007

 

Manual Project 20063236 Substation B Replacement, File 1 Operation & Maintenance , n.d.

 

Project 20063236 Operation & Maintenance Manual Substation B Replacement, File 2, Section 5, n.d.

 

Project 20063236 Operation & Maintenance Manual Substation B Replacement , File 3 Sections 6-8

 

Operations & Maintenance Manual Law School IUPUI # 87-4-238, 3/15/1988 File 1

 

 

Plumbing Fixtures

 

 

Floor Drain

 

 

Heat & Cool Equipment

 

 

Grill Diff Extractors

 

 

Damper Fans

 

 

Temp Controls

 

 

Balance Report

 

 

Valve Tag

 

 

Fire Alarm System

 

 

Wiring Devices

 

 

Panelboard Fuses

 

Operations & Maintenance Manual Law School IUPUI # 87-4-238, 3/15/1988 File 2

 

 

Lighting Controls

 

 

Wood Doors & HDWR

 

 

Resilient Flooring

 

 

Carpet

 

 

Wallcovering

 

Project Manual Law School Test, Adjust, & Balance Report, 5/7/2001

Specs. Law School IUPUI# 6505, 3/15/1968 [2 folders]

 

Specs Law School (Bid Set) IUPUI# 6505, 3/15/1968 [2 folders]

 

Ransburg Building Remodeling Equipment Installation/Operation Instructions Mechanical, 12/8/1966

 

Mary Cable School Building Feasibility Study 6/20/1991

 

Specs for Mechanical & Electrical Systems for Mary Cable School, IUPUI# 8572187, 10/25/1985

 

Maintenance Manual for the Mary Cable Building Electrical Renovations- IUPUI School of Music #997-6187, 2000

14

Operational & Mechanical Mary Cable, n.d.

 

 

Elec/Boiler

 

 

Mech/Elec. Specs (10/25/1985)

 

 

Electrical Renovations ((8/24/2000)

 

Project Manual Mary Cable Building Demolition IU Project #20051667, 6/2005

Law School Energy Audit 6/15/1995

 

Operational & Mechanical Manual Law School Mechanical Systems 5/13/1971 (File 1)

 

 

Temp Control

 

 

Chiller

 

 

Instruction Book Trane Air Condition

 

 

Cooling Tower

 

Operational & Mechanical Manual Law School Mechanical Systems 5/13/1971 (File 2)

 

 

HTG & Vent Units

 

 

Auto Filters

 

 

Pumps

 

 

Fans

 

 

Venilators

 

 

Meter

 

 

Heating Specialties

 

 

Flush Valves

 

 

Water Coolers

 

 

Pressure Vessel Data

 

 

Electrical Blue Prints

 

Mechanical & Electrical Specifications for Law School 3/15/1968

 

Specification for Mechanical & Electrical for Law School 10/23/1967

 

Law School Project # 2-5-00140-0 Primary Switchgear

 

Law School Project # 2-5-00140-0 Lighting Fixtures

 

Law School Project # 2-5-00140-0 Motor Controls

 

Law School Project # 2-5-00140-0 Capacitors 5/14/1969

 

Law School Project # 2-5-00140-0 Motorized Dimmers 5/14/1969

 

Law School Project # 2-5-00140-0 Cable Tray 5/14/1969

 

Law School Project # 2-5-00140-0 Sound Systems 5/14/1969

 

Law School Project # 2-5-00140-0 Panel Boards 3/5/1969

 

Law School Project # 2-5-00140-0 Bus Duct 3/10/1969

 

Law School Project # 2-5-00140-0 Secondary Switchboard 3/10/1969

 

Law School Project # 2-5-00140-0 Dry Type Transformers 3/10/1969

 

Law School Project # 2-5-00140-0 Primary Transformers 3/10/1969

 

Law School Project # 2-5-00140-0 Motorized Dimmers 12/7/1970

 

Law School Project # 2-5-00140-0 Motorized Controls 12/7/1970

 

Law School Project # 2-5-00140-0 Motor Control Centers 12/7/1970

 

School of Law Valve Chart 5/13/1971

 

School of Law Motor Data 12/7/1970

 

Central Chilled Water University Hospital System Phase II IUPUI #859-2240, 2/1986

 

Project Manual for Construction or an Addition to the Indiana State Bd of Health, 8/16/1968

 

O&M Manual Eyewash & Emergency Showers Installation Proj. # A70-301A

 

 

Firestop Sealant

 

 

Starters

 

Project Manual for Laboratory Hoods, Eye Wash, & Emergency Showers Proj. #A70-301A, 5/20/1995

 

Project Manual for Laboratory Hoods, Eye Wash, & Emergency Showers Proj. #A70-301A, 3/22/1996

 

Eye Wash & Emergency Shower Installation, 8/19/1996

 

 

Fixtures

 

 

Pump

 

Project Manual for Mechanical Construction Addition to State Board of Health Building Proj # A70-701, 8/16/1968

 

Survey and Analysis of HVAC & Electrical Systems, State Proj #A70-511/CDG Proj. # 8601, 3/23/1987

 

Installation & Start up Instructions Model 214 Vertical Scale Indicator, 1/63

15

 

Model 214 Scale Indicator

 

 

Model 242 Transmitter

 

 

Model 255 Transmitter

 

 

Model 391 Primary Elements & Fittings for Fluid Measure

 

 

Model 771 Hays Integrator

 

 

Model 854 Universal Controller

 

 

Model 855 Universal Controller

 

 

Installation Operating Instructions Electrical Power Units E873/874C

 

 

Hays Control Drawings

 

Power Plant Westinghouse Electric. Corp. Medium Voltage Switchgear, 5/14/1987

 

Operational & Maintenance Manual Power Plant Substation C, 9/23/2003, File 1

 

 

CD-Rom

 

 

ARC Flash Data

 

 

Coordination Study

 

 

Table of Contents

 

 

Torque Table

 

 

Power Up/Down

 

 

Maint. Guide

 

 

Drawings

 

Operational & Maintenance Manual Power Plant Substation C, 9/23/2003, File 2

 

 

Bill of Material

 

 

Voltage XFRMR

 

 

ABB L.I. Switch

 

 

Main Fuses

 

 

Surge Arrestors

 

 

Vacuum Switches

 

 

Reactors

 

 

Capacitor Fuses

 

 

Capacitors

 

 

Nokian A12 Controller

 

 

PLC

 

 

Relays OV, OT & Unbalance

 

 

Unbalance PT

 

 

Paint Specs

 

 

Door Locks

 

 

Exhaust Fan

 

 

PML ION 7500

 

Power Plant Trouble Shooting & Repair Manual Generator Sets, 1987

 

Power Plant Folder 1

 

 

Smoke Breeching Repair, 11/12/1964

 

 

Specs Repair Brick 11/8/1965

 

Power Plant Folder 2

 

 

Steam 10/20/1964

 

 

Steam Generator Specs 6/25/1965

 

Power Plant File 3

 

 

Repointing and Repair of the Exterior Brick Walls, 11/8/1995

 

Power Plant File 4

 

 

Insurance Inspections, 8/4/19435/6/1966

 

Power Plant File 5

 

 

Misc., 1950-1962

 

Power Plant File 6

 

 

Install/Operating Instructions ARE Series Standby Power Charger

 

 

Stationary Battery

 

 

Specs Standby Steam Gen. 2/9/1966

 

 

Bowers Specs Project Manual, 7/28/1965

 

 

Roofing

 

 

Specification Alterations to Present Office

 

 

Specification for Remodel 7/28/1965

 

 

Specification for Remodel

 

Maintenance and Parts Manual Warthin Apartments, 3/22/1983

 

Warthin Apartment Elevator Addition Operations & Maintenance, D.O. #815-1366, 1/17/1983 [2 folders]

 

Warthin Apartment Addition Plans

 

Warthin Apartment Elevator Addition

16

 

Heating Equipment

 

 

Plumbing Equipment

 

Warthin Apartments Heating, Ventilating, Plumbing, & Electrical Installations, 10/1956

 

Warthin Apartments General Construction 10/8/1957

 

Warthin Apartments Specs for Heating, Ventilating, Plumbing and Electrical Installations 10/1956

 

Warthin Elevator IUPUI 815-1366 Change Bulletins and Change Orders 12/1982

 

Warthin Elevator IUPUI 815-1366 Submittals, 1983

 

Summary of Work RIS Paper Building, 3/25/2005

 

Misc. Documents

 

Radial Brick Chimney for 1950 Power Plant Extension, 5/15/1950

 

Structural Portion of Power Station Extension, 5/8/1950

 

Steam Generating Units for Extension of Power Station 10/14/1949

 

Miscellaneous Auxiliary Equipment and Piping System for Extension of Power Plant, 5/16/1929

 

Switch Board for New Generator Unit & Changes & Additions in Wiring Systems for Extension of Power Plant 5/16/1929

 

Boiler & Mechanical Stoker for Extension of Power Plant, 5/16/1929

 

Remodeling of Power Plant for Riley Hospital 6/3/1929

 

Report on the Advantages of Purchased Electric Power 4/7/1950

 

Review & Comments on Report of Indianapolis Power & Light  Company on Advantages of Purchasing Electrical Power, 3/23/1951

 

Architectural Portion of 1950 Power Plant Extension Including Drainage & Plumbing System 5/15/1950

 

Addition to Power House, 1950

 

Additional Sub-Station Capacity & Electrical Distribution System, 5/1/1957

 

Additions & Alterations to Vacuum Condensate Piping System & Installation of Ash System Air Washer, 11/16/1953

 

Power Plant Reports 1928-1936

 

 

1928-1931

 

 

1932-1934

 

 

1943-1936

 

Power Plant Reports 1942-1969

 

 

1942-1950

 

 

1950-1951

 

 

1951-1952

 

 

1952-1953

 

 

1953-1954

 

 

1954-1955

 

 

1955-1956

17

 

1956-1957

 

 

1957-1958

 

 

1958-1959

 

 

1959-1960

 

 

1960-1961

 

 

1961-1962

 

 

1962-1963

 

 

1963-1964

 

 

1964-1965

18

 

1965-1966 [2 copies]

 

 

1966-1967

 

 

1967-1968

 

 

1968-1969

 

School of Nursing Learning Resource Center Electrical Operation Maintenance Manual, 2008

19

 

16510 Interior Luminaries

 

 

16134 Cable Trays

 

 

16272 Dry Type Transformers

 

 

16423 Enclosed Motor Controllers

 

 

16443 Panel Boards

 

 

16725 Telecommunications

 

School of Nursing Operations & Maintenance Manual , 2008 File 1

 

 

Case Work

 

 

 Store Front

 

 

 Doors Frames & Hardware

 

School of Nursing Operations & Maintenance Manual, 2008 File 2

 

 

Ceramic Tiles

 

 

Gypsum Wallboard Assemblies

 

 

Acoustic Ceiling Tiles

 

 

Flooring & Paint

 

 

Cubicle Track Display Case & Boards

 

 

SS Corner Guards Operable Partitions

 

 

Project Screens

 

School of Nursing Mechanical Operation & Maintenance Manual File 1, 2008

 

 

Test & Balance Report

 

 

O & M Manuals Vacuum System Split unit AC

 

 

15075 Pipe Markers and Valve Tags

 

School of Nursing Mechanical Operation & Maintenance Manual File 2, 2008

 

 

1502 & 15086 Pipe & Duct Insulation

 

 

15812 Coil Pak for VAV Units

 

 

15145 & 15146 Floor Drain & Sanity Pipe & Fittings

 

 

15145 & 15214 Copper Fittings

 

 

15214 Med Gas Equipment

 

 

15214 & 15145 & 15182 Valves

 

 

15140 Plumbing Fixtures

 

 

15725 Ductless AC Unit

 

 

15840 Air Terminal Units

 

 

15850 Air Outlets & Inlets

 

Manual University Place Conference  Center & Hotel Operations & Maintenance, Vol. 1, File 1

 

 

Table of Contents

 

 

Sublist

 

 

Warranties O&M Manuals

 

 

General Requirements

 

 

Sitework

 

 

Concrete

 

 

Masonry

 

 

Metals

 

 

Wood & Plastic

 

 

Thermal Moisture Protection

 

 

Doors & Windows

 

 

Finishes

 

 

JLCF Warranty

 

 

Carpet

 

 

Resilient

 

 

Specialities

 

University Place Conference  Center & Hotel, Operations & Maintenance Manual Vol. 1, File 2

 

 

Equipment

 

 

Dough Pro

 

 

Fetco

 

 

Gaylord

 

 

Hatco

 

 

Jade

 

 

Keating

 

 

Piper

 

 

Traulsen

 

 

Wells

 

 

Wittco

 

 

Furnishings

 

l University Place Conference  Center & Hotel, Operations & Maintenance Manua Vol. 1, File 3

 

 

Special Construction

 

 

Convey Systems

 

 

Mechanical

 

 

Plumbing Valves—Resubmittal

 

 

Hangers & Support

 

 

Mechanical Identification

 

 

HVAC Insulation

 

 

Private Water Supply Report

 

 

Food Court Redevelopment

 

 

Plumbing Fixtures

 

 

HVAC Valves- Resubmittal

 

 

Standard Testing Record Form

 

 

Meters & Gauges- REsubmittal

 

 

Hangers & Supports

 

 

Vibration Controls

 

 

Mechanical Identification

 

 

HVAC Insulation

 

Operations & Maintenance Manual University Place Conference  Center & Hotel, Operations & Maintenance Manual Vol. 1, File 4

 

 

Flow Control Valves-Resubmittal

 

 

Valves Pumps and Accessories

 

 

Sheet Metal Duct Construction Standards

 

University Place Conference  Center & Hotel, Operations & Maintenance Manual Vol. 1, File 5

 

 

Heat Exchanger

 

 

Air Handling Units

 

 

Fan Coil Units

 

 

Finned Tube Radiation

 

University Place Conference Center & Hotel,  Operations & Maintenance Manual, Vol 2.—Electrical, File 1

 

 

Complete Electrical

 

 

Section 260533 Raceway and Boxes

 

 

Section 260933 Central Dimming System

 

 

Section 262200 Low Voltage Transformers

 

University Place Conference Center & Hotel, Operations & Maintenance Manual, Vol 2.—Electrical, File 2

 

 

Food Court Renovation 262813 Fuses

 

 

Food Court Renovation 262913 Enclosed Controllers

 

 

Warranty Section 265100 Interior Lighting

 

 

Warranty Section 271500 Communications Horizontal Cabling

 

University Place Conference Center & Hotel, Operations & Maintenance Manual, Vol 2.—Electrical, File 3

 

 

Food Court Renovation 274116 AV Installation

 

 

Food Court Renovation 283111 Digital Addressable Fire Alarm System

 

University Place Conference Center & Hotel, Operations & Maintenance Manual, Vol 3-A/V Installation, File 1

 

 

Product Data

 

 

Drawings

 

 

Warranty

 

 

In Service Training

 

IUPU Columbus Center-Library Remodel Operation & Maintenance Manual, Project# IU20063051, 2008

 

 

Table of Contents

 

 

Operations & Maintenance

 

 

Carpet & Resilient Base

 

 

Ceramic Tile

 

 

Glass

 

 

Markerboards/Tackboards

 

 

Plumbing/HVAC

 

 

Projection Screens

 

 

Steel Frames/Wood Doors/Finish Hardware

 

 

Window Treatments

 

 

Parts & Equipment Nomenclature

 

 

Product Warranties

 

 

Atlas Flooring

 

 

Claridge Chalkboards/Markerboards

 

 

Fire Extinguisher/Products

 

 

Johnson Controls HVAC

 

 

Draper Projection Screens

 

 

Stanley Doors/Hardware

 

 

Subcontractor/Vendor Contact List

 

 

Contractor/Subcontractor Warranties

 

 

Quantum General Contractors

 

 

Certified Floor Covering Services

 

 

Claridge Products & Equipment

 

 

DL Industrial

 

 

Flawless Construction & Demolition

 

 

General Interiors

 

 

Guardian Fire Systems

 

 

Hawkins Cabinet Co

 

 

Indiana Drapery

 

 

IRC Roofing

 

 

John Ulrey’s Glass & Mirror

 

 

McCammack Tile

 

 

O’Sullivan Painting & Caulking

 

 

The Genesis Company

 

 

Testing Reports

 

IUPU Columbus Center-West Wing Renovation Operation and Maintenance Manual, Project # IU20063050, 2008

 

 

Table of Contents

 

 

Carpet & Resilient Base

 

 

Ceramic Tile

 

 

Glass

 

 

Markerboards/Tackboards

 

 

Plumbing/HVAC

 

 

Projection Screens

 

 

Steel Frames/Wood Doors/ Finish Hardware

 

 

Window Treatments

 

 

Parts & Equipment

 

 

Atlas Flooring

 

 

CIH Doors/Hardware

 

 

Claridge Chalkboards/Markerboards

 

 

Johnson Controls HVAC

 

 

Draper Projection Screens

 

 

Subcontractor/Vendor Contact List

 

 

Quantum General Contractors

 

 

Certified Floor Covering Services

 

 

Claridge Products & Equipment

 

 

DL Industrial

 

 

Flawless Construction & Demolition

 

 

General Interiors

 

 

Guardian Fire Systems

 

 

Indiana Drapery

 

 

IRC Roofing

 

 

John Ulrey’s Glass & Mirror

 

 

McCammack Tile

 

 

O’Sullivan Painting & Caulking

 

 

The Genesis Company

 

 

Testing Reports

 

 

Updated Jul 15, 2016 by Webmaster